Internships

Internship Image

Naval Research Enterprise Internship Program (NREIP)

This program places college and university students in Department of Navy (DoN) laboratories where they take part in real Naval research for ten weeks during the summer.

NREIP gives academically talented college students, graduating seniors, and graduate students pursuing STEM careers the opportunity to learn about Naval research and technology while receiving first-class mentoring by top scientists and engineers.

NREIP is a competitive program with over 800 placements in 62 laboratories around the country in which many participants go on to careers within the DoN. Interns are selected based upon academic achievement, personal statements, recommendations, and career and research interests.

Both aircraft are maintained under the Integrated Maintenance Program (IMP), and because they share many common components, their maintenance procedures are very similar.

NREIP Quad charts

Get an idea of what interns work on at our facility!

Fleet Readiness Center Southwest UH-1Y Venom helicopter

U.S. Marines fast rope out of a UH-1Y Venom helicopter.

Fleet Readiness Center Southwest AH-1Z Viper helicopter

An AH-1Z Viper taxis down the flight line aboard MCAS Camp Pendleton, California.

Fleet Readiness Center Southwest UH-1Y Venom helicopter

U.S. Marines fast rope out of a UH-1Y Venom helicopter.

Fleet Readiness Center Southwest AH-1Z Viper helicopter

An AH-1Z Viper taxis down the flight line aboard MCAS Camp Pendleton, California.

H-53 Helicopter
CH-53E Super Stallion

For more than 30 years, the CH-53E Super Stallion helicopter has remained a staple in the logistics toolbox of Navy and Marine Corps operations.

The largest helicopter ever built by the Defense Department, the CH-53 can transport up to 16 tons of cargo and is often assigned to amphibious class ships.

FRCSW provides MRO events to those CH-53Es assigned to Marine Corps Air Station (MCAS) Miramar.

The maintenance schedule of the Super Stallion is based upon a 54-month cycle of the Integrated Maintenance Program (IMP).

The IMP targets structural repairs to the fuselage and includes replacing the skin, transition bulkhead, cockpit floorboard, any KAPTON electrical wiring upgrades and corrosion repair throughout the aircraft.

After induction, FRCSW artisans disassemble the aircraft and begin the IMP inspection specifications.

The program operates in two buildings: one where fiberglass and component work is done and the other where the remaining airframe work is completed.

The IMP workload standard requires about 16,000 manhours per aircraft.

Unlike the IMPs of other airframes serviced by FRCSW, the Super Stallion program is a combination of organizational level (O-level), or work handled by the Marine Corps squadrons, and depot-level work.

In the event a repair exceeds O-level capability, the Marines have the option to transfer the repair to the depot as an In-service Repair (ISR).

Fleet Readiness Center Southwest CH-53E Super Stallion

A CH-53E Super Stallion helicopter landing on the flight deck of the amphibious assault ship USS Bonhomme Richard (LHD 6).


H-60 Helicopter
MH-60R, MH-60S Sea Hawk

To improve its H-60 MRO capacity, FRCSW opened Building 325 in 2016, an 110,627 square-foot facility solely devoted to the maintenance and repair of the Sea Hawk.

The command’s H-60 MRO program applies the Integrated Maintenance Program (IMP) to assess and ensure the structural integrity of the MH-R and MH-S models of the airframe. Both models support aircraft carrier battle groups. Under the IMP, aircraft undergo a Planned Maintenance Interval-One or Two (PMI-1 or PMI-2) cycle.

PMI is a cell-based structure, with each cell dedicated to a specific function that includes induction, disassembly, evaluation, repair, modification, assembly, test and finally a “sell” or return to the fleet.

The inspection targets six sections or zones of the aircraft. Not all zones are covered during both PMI cycles. During PMI-1 the cockpit, cargo area, fuel system, tail pylon and tail rotor are examined. In PMI-2, artisans revisit the cockpit and cargo area, and assess the tail cone and the upper deck of the aircraft and main rotor.

The aircraft is also stripped and painted.

Although out of the scope of the IMP, FRCSW handles in-service repair (ISR) work on major components under a separate work order. Modifications and upgrades, like avionics, are also sizable portions of workload

Six years ago, the command purchased a Laser Alignment Fixture to assist in the repair of crash damaged H-60 aircraft.

The only one of its kind in the Navy today, the system is applicable to all H-60 variants and enables the alignment of the aircrafts beams, drive shaft and engine mount.

Use of the fixture expanded in FY 2018 when Fleet Support Team engineers applied it during a study to establish baseline data to extend the life of the airframe.

Fleet Readiness Center Southwest MH-60S Sea Hawk helicopter

An MH-60S Sea Hawk helicopter fires an AGM-114B Hellfire missile during a live-fire exercise.


Fleet Readiness Center Southwest HH-60G Pave Hawk helicopter

An FRCSW sheet metal mechanic installs a bracket on an Air Force HH-60G Pave Hawk helicopter.

AV-8 Aircraft
AV-8B Harrier II

For more than 15 years FRCSW has provided MRO services to the vertical/short takeoff and landing (VSTOL) AV-8B Harrier jet.

Designed in the late 1970s, the single-engine aircraft entered service with the Marines Corps in the mid-1980s and is used in light attack and reconnaissance missions.

Operating from its sites at Marine Corps Air Station Yuma, AZ, and Naval Air Weapons Station China Lake, CA, FRCSW performs a Planned Maintenance Interval-D (PMI-D) on the airframe.

PMI-D is scheduled approximately two years in advance in conjunction with the AV-8B Weapon Systems Program Office (PMA-257) and the AV-8B Fleet Support Team (FST).

Prior to induction, the engine is removed and the wing assembly is disassembled. The aircraft’s squadron removes the ejection seat and explosive cartridge actuated devices.

During PMI-D, artisans inspect and repair damaged or worn sections of the airframe and its components. Most of the aircraft have various airframe and mission system modifications completed simultaneously with the PMI event.

Repairs outside of the PMI are completed separately as in-service repairs (ISR), or are separate work orders. ISRs average about 7,000 hours annually on the airframe.

Fleet Readiness Center Southwest AV-8B Harrier II

An AV-8B Harrier II prepares to land aboard the amphibious assault ship USS Boxer (LHD 4).